Waikato hospital
Project Year: 2023
Project Overview:
Demoworx were engaged as a main contractor directly by TWO because of consistent project performance. We demolished and recycled to a greenstar v2 standard three hospital buildings, completed asbestos removal, excavated and levelled the site before getting relevant surveys and signoffs before handing site over to the construction contractor. Demoworx has since been engaged directly by Naylor Love and awarded the second stage of the project due to begin in 2024.